1. When there is a “level crossing” warning sign.
  2. When there is no asphalt or cement road that leads to the level crossing, at a distance of at least 20 meters before the nearest track.
  3. When a “stop” sign is placed before the tracks.
  4. When a “right of way” sign is placed before the tracks.